Hykes Road work delayed to Friday, Jan. 27

Staff Writer
Echo Pilot

The closure of Hykes Road has been postponed from Wednesday until Friday, Jan. 27, as Norfolk Southern contractors work on the bridge. The contractor building a bridge to span the Norfolk Southern train tracks leading to the terminal under construction will be doing work all day in that area.  

Traffic will be interrupted all day, and stopped completely between 11 a.m. and 4 p.m. for 30 minute periods. When travel is interrupted there will be a single lane of controlled traffic. As a result,  Antrim Township urges residents to avoid Hykes Road on Friday for through traffic if at all possible.